• Fengfan Phoenix Clean 151 Degreasing Wax Removal Agent
  • Fengfan Phoenix Clean 151 Degreasing Wax Removal Agent

Fengfan Phoenix Clean 151 Degreasing Wax Removal Agent

Water-soluble powder that removes light oil, heavy oil and polishing wax in one bath before the aluminum anodizing process. 20–60 g/L, 50–70 °C.
  • Fengfan Phoenix Clean 151 Degreasing Wax Removal Agent

Description

Product Overview

This is a water-soluble degreasing powder for aluminum that has to be cleaned before it goes into the tank. Mixed with water it gives a mildly alkaline bath that lifts light oil quickly, cuts through the heavier drawing and machining lubricant found on pressed and turned parts, and — the part most cleaners miss — breaks down the polishing wax left behind after buffing.

That combination matters. Wax and oil are the two contaminants that ruin a finish: wax smears burn into the surface during the aluminum anodizing process and show up later as patches, streaks and uneven dye uptake, while an oil film causes water breaks that stop the oxide forming evenly. Cleaning both in one bath removes a tank, a rinse and a transfer from the line.

Whether the shop runs a production tank or a small bench tank, the settings work the same way. Dose, pH, temperature and time can each be dialled to the load, so a short gentle cycle on thin decorative trim and a longer, hotter cycle on wax-heavy hardware come out of the same pack of powder.

Fengfan Phoenix Clean 151 Degreasing Wax Removal Agent

Specifications

ParameterOperating rangeRecommended condition
Dosage (Phoenix Clean 151)20–60 g/L45–55 g/L
pH range7.5–12.08.5–11.0
Temperature50–70 °C55–65 °C
Time (approx.)3–30 min5–15 min
Air stirringSuggested useSuggested use
UltrasoundSuggested useSuggested use
Circulation filtrationSuggested useSuggested use
Product formWater-soluble powder—

Degreasing and Dewaxing Chemistry

  • Light oil lifts first. Handling oil and thin stamping lubricant come off quickly at the lower end of the working band, which is why freshly machined parts clean on a short cycle.
  • Heavy oil needs longer. Deep-drawn and heavily lubricated parts carry a thicker film, so they run at a higher dose and a longer dwell until the surface wets out completely.
  • Polishing wax is the stubborn one. Buffing compound is pressed into the metal by the wheel and does not behave like oil; a dedicated dewaxing component softens it and lifts it away instead of leaving a smear that only appears after anodizing.
  • Surface active agent action holds the soil in the bath. The solution wets the metal, rolls the oil film off the surface and keeps the contamination suspended so it does not settle back onto the part as the rack is withdrawn.
  • Mild alkalinity keeps the attack controlled. The bath is weakly alkaline rather than strongly caustic, so it cleans without biting aggressively into the metal or altering the dimensions of a finished part.
  • It all happens before oxide growth. This is a step inside the anodizing aluminum process, not a repair for it: an even oxide can only build on a surface that is genuinely clean.

Operating Conditions and Bath Parameters

  1. Fill the tank with clean water, bring it to working temperature and add the powder slowly with stirring until it has fully dissolved. The surface active agent has to be completely in solution before the first load — powder sitting on the bottom of the tank does nothing for the parts.
  2. Set the concentration from the soil load: the low end for light handling oil, higher up for heavy lubricant or wax-rich parts. Weigh the powder rather than scooping it; hitting a number is the whole point of a powder.
  3. Measure pH and bring it into the working band before the first load, then re-check at the start of each shift. pH drifts as oil and wax are taken into the bath.
  4. Set the dwell time against how the parts come out, not against the clock alone. A load that still shows a water break after rinsing needs longer; a load that is already water-break free is being held for nothing.
  5. Run air stirring as the default. It keeps fresh solution against the surface and stops wax pooling on top of the parts.
  6. Add ultrasound where the geometry is difficult — recesses, blind holes, tight profiles or dense racks of small parts.
  7. Fit circulation filtration if the shop has a filter circuit. Wax and oil have to go somewhere, and a filter takes the solids out of circulation instead of letting them re-deposit on the next load.
  8. Rinse thoroughly and quickly after the bath. Alkaline cleaner carried into the following tank is the usual cause of a hazy start to the aluminum anodizing process.
  9. Top up on analysis rather than on appearance. A dark bath can still be within specification, and a clean-looking one can be low on strength; replace it when the wax load can no longer be held.

Product Advantages

  • One bath instead of two. Degreasing and dewaxing happen together, so there is no separate wax-stripping tank, no additional rinse and no second transfer between them.
  • Fast on everyday oil. Freshly machined or handled parts come clean on a short cycle, which keeps the front of the line moving.
  • Still effective where the oil is heavy. Parts that come off a drawing press or arrive with a thick protective film are handled by the same product at a higher dose, rather than needing a different chemistry.
  • Wax comes off before it can spoil a finish. Buffed parts that go straight into the tank carry wax into the oxide; taking it off here is what keeps anodized aluminum clear, even in colour and free of patchy dye take-up.
  • Powder keeps the numbers honest. There is no water to pay freight on, the pack stores flat, and a small shop can weigh out a bucket-sized batch without buying a drum of liquid it will never finish.
  • Predictable across mixed loads. Because the working window is wide, one bath covers trim, panels, hardware and small machined parts for an aluminum anodizing service without being changed between jobs.

Surface Effects and Material Compatibility

The powder is built for aluminum plate, extrusion sections, formed trim, machined components and similar prepared surfaces. It handles the whole spread of contamination found on those parts — light handling oil, heavier drawing and machining lubricant, and the polishing wax left by a buffing wheel — without needing a different product for each.

What the bath leaves behind is a surface that rinses to a full water break. That is the practical test before the anodizing aluminum process: if water sheets evenly the oxide will grow evenly, dye will take up consistently and a sealer will have something uniform to work on; if water pulls back into droplets, there is still oil or wax on the metal.

Because the bath is only weakly alkaline, the risk of over-etching thin sections or losing dimensional tolerance is low, and polished or brushed faces keep their appearance through the clean. It is still a cleaner rather than an etch or a desmut: parts carrying heavy oxide, heat-treat scale or smut need their own treatment step, and parts that are already anodized or dyed should not go through this bath at all.

For a plant running mixed alloys, test a small batch of each new alloy or casting before committing a full load. High-silicon die castings and parts with inserts can behave differently from wrought material, and a ten-minute trial is cheaper than a rejected rack.

Use Scenarios

  • Decorative trim and architectural panels. Parts are cleaned before the aluminum anodizing process so the finished face is free of buffing marks, streaks and dye mottling.
  • Job shops with mixed racks. Brackets, hardware and small machined parts go through one bath whether the soil is oil or wax, so a load does not have to be split by contamination type.
  • Buffing and polishing departments. Parts that come off the wheel with compound still on them have the wax removed before racking, rather than after the defect has already been sealed into the oxide.
  • Small workshops and laboratories. A bench tank or an aluminum anodizing kit runs a weighed-out batch of powder and gets the same chemistry as a full line at a fraction of the volume.
  • Plant housekeeping. Racks, jigs and handling equipment that pick up oil and wax over a production week can be cleaned in the same bath so contamination is not carried back onto parts.

Robust System Design and Formulation

The design choices behind the powder are about fitting a line that already exists rather than asking the line to change. Because it is water-soluble, concentration is set by weight — the same measurement on a bench tank as on a production tank — so the bath can be built to the strength the job needs instead of being poured from a drum at a fixed dilution.

Dosage, pH, temperature and time each have a usable band rather than a single set point. A shop with a simple heated tank and a shop with tight temperature control both run within specification: when a load needs more, you move up the band, and when parts are thin or delicate you move down it.

The bath is equally tolerant of how the tank is equipped. Air stirring alone is enough to run production; ultrasound can be added where parts have recesses or the rack is dense; circulation filtration can be fitted wherever a filter circuit already exists. None of them is a prerequisite for using the product.

Sizing up is not a reformulation. A workshop that starts on a small aluminum anodizing kit and later moves to a full tank keeps the same product, the same dosage logic and the same rinse routine, so what worked on the bench still works on the line.

Process Efficiency and Surface Cleanliness

  • Fewer rejects at the anodizing stage. Most patchy, streaked or blotchy work traces back to something left on the surface beforehand; removing oil and wax in one controlled step takes out the cause rather than the symptom.
  • Less rework after the fact. A part that is clean the first time does not come back for stripping and refinishing, which is the most expensive outcome on decorative work.
  • Consistent results across a mixed load. Trim, brackets and small machined parts with different soils can share a bath and still come out uniformly clean.
  • Uniform colour on dyed work. With the wax gone, dye take-up is even across the load — which matters most on anodized aluminum that has to match a sample or an earlier batch.
  • A cycle you can dial in. Because time and temperature are adjustable, throughput is balanced against cleanliness instead of being fixed by the chemistry.
  • A cleaner working tank. Filtration and regular top-up keep the bath in service longer, and a bath that is not loading up with wax keeps giving the same result through the week for an aluminum anodizing service.

Powder Handling and Storage

The surface active agent that does the work in the tank is a fine solid in the pack, and it draws moisture from the air. Keep packs closed between use, store them dry and off the floor, and reseal a part-used pack instead of leaving it open next to a warm tank.

Weigh out what you need in a ventilated area and add it to the water slowly. Tipped in from height or poured in quickly it raises dust; a dust mask, eye protection and gloves are normal practice for any alkaline powder of this type, and the safety data sheet sets out the specific precautions for this grade. Store the packed product away from acids and away from direct sunlight or high heat.

Make up with clean water. Hard water, or water carrying organics, works against a cleaner whose job is to hold oil in suspension and makes the bath harder to control from one shift to the next.

Do not return weighed-out powder to the original pack, and do not mix leftovers with older stock. The safety data sheet and the technical data sheet for this grade are available from your sales contact.

Ordering and Delivery

ItemDetail
Payment100% T/T in advance
Minimum order quantityVaries by chemical; confirmed with our sales team per order
Lead time2 weeks
Packing10 kg/box; 25 kg or 50 kg/bag; 20 kg/25 kg/30 kg/200 kg/drum; 1,000 kg/IBC drum
ShippingPer the terms agreed in the current contract
Batch documents and warrantyInspection certificate issued after delivery stating the batch number and warranty period

About Fengfan

Wuhan Fengfan International Trade Co., Ltd. is the wholly owned trading arm of Wuhan Fengfan Electrochemical Technology Co., Ltd., founded in 1984 — more than four decades in surface treatment chemistry. The range covers pretreatment and degreasing agents, anodizing chemicals, sealing agents, additives and post-treatment products, so the rest of the anodizing line, from etching to electrolytic colouring to sealing, can be sourced alongside this one.

Production runs on a site of about 67 acres with roughly 7,000 m² of floor space and an annual capacity for surface treatment additives in the region of 3,000–5,000 tonnes. The company maintains its own research and development laboratories and quality control, holds safety production standardization and clean production credentials, and supplies both large production plants and smaller workshop operations.

That mix is deliberate. The same chemistry has to serve a line running continuous decorative work and a workshop mixing a single batch, and the formulation behind this powder was set up so that both can run it from one specification.

Technical Support & Model Matching

Choosing the right match is where most sourcing decisions stall. As a trading supplier, we keep one point of contact from first enquiry to after-sales: tell us what you are making and the conditions you work under, and we shortlist the closest matches from our supplier network, compare specifications and arrange samples before you commit to a bulk order. If something does not behave as expected, we work with the supplying partner on the cause and a practical fix, and stay with the case until it is settled. Email, WeChat or WhatsApp enquiries get a reply within 24 hours.

FAQ

What is this degreasing powder used for?

It cleans aluminum before anodizing. Mixed with water it removes light oil, heavier machining and drawing lubricant, and the polishing wax left behind after buffing — all in one bath. Getting those off the surface is what lets the anodizing aluminum process build an even oxide layer, so this is the step immediately before the parts are racked.

What concentration should we run?

The working range is 20–60 g/L and most production sits at 45–55 g/L. Start at the low end for light handling oil and move up for heavy lubricant or wax-rich buffed parts. An aluminum anodizing service running mixed decorative work usually settles in the middle of that band and adjusts per load rather than per bath. Weigh the powder — the bath is only as repeatable as the measurement.

What temperature and duration are typical?

Run at 50–70 °C, with 55–65 °C covering most work, and allow roughly 3–30 minutes of contact, typically 5–15 minutes. Use the short end for light oil on clean parts and the longer end where buffing wax has to be softened. Temperature and time trade against each other: a hotter bath cleans faster, a cooler one needs longer.

Does it cope with heavy oil and residual polishing wax?

Yes — those are the two cases it is built around. Light oil comes off quickly, heavier drawing or protective oil is handled at the higher dose and temperature, and a dedicated dewaxing component lifts the compound that mechanical polishing presses into the surface. That matters because wax carried into the tank burns in and later shows as patchy anodized aluminum, uneven dye and adhesion faults.

Will it work in a small kit and on a full-scale line?

Both, provided the bath stays inside its stated bands. The same powder runs a bench tank or an aluminum anodizing kit from a weighed batch, and a production tank with air stirring, ultrasound or circulation filtration. Nothing in the chemistry changes with scale — only the volume and the way the tank is agitated.

Can it be used on parts that are already anodized?

No. This is a pre-anodizing cleaner for bare aluminum. On a finished anodized or dyed surface an alkaline bath can dull the colour and work on the sealed layer, so keep finished parts out of it and use a cleaner intended for coated work instead.

REQUEST MORE DETAILS

Please fill out the form below and click the button to request more information about
Name
Email *
Message
Verification Code *
Click to verify
Leave a message
Name
Email *
Message
Verification Code *
Click to verify