Fengfan Sulfate Acid Zinc Plating Chemicals Electroplating Additives Stable Performance SZ-30

SZ-30 brightener for acid zinc sulfate baths, giving continuous galvanizing and single workpieces a smooth, bright, leveled deposit.
  • Fengfan Sulfate Acid Zinc Plating Chemicals Electroplating Additives Stable Performance SZ-30
  • Fengfan Sulfate Acid Zinc Plating Chemicals Electroplating Additives Stable Performance SZ-30

Description

Sulfate Acid Zinc Plating

This is a brightener for sulfate acid zinc plating — the zinc sulfate and boric acid bath used wherever a metal plating line has to lay down a bright, ductile zinc layer quickly. It is charged at make-up and topped up as the bath consumes it, and it is not tied to a single recipe, so it can go into a bath that is already in production.

Continuous galvanizing is the main home for it: wire, strip and tube travel through the bath at speed, and in a process of electroplating measured in seconds the coating has to form evenly. It also handles rack loads and single workpieces dipped one at a time, which lets a shop running both continuous and job work keep one additive on the shelf.

It sits inside a broad range of acid zinc plating chemicals that also covers potassium chloride systems, cyanide-free alkaline processes, purification agents and the passivation and sealing steps that follow. That matters when a line is being converted or a second source is needed: the chemistry, the dosing advice and the documentation come from one place instead of three.

Key Properties

  • Stable from shift to shift. Brightness holds through a working week rather than drifting between additions, so the plating process needs less trimming and fewer re-checks.
  • High current efficiency. Most of the current goes into zinc rather than into hydrogen, which keeps deposition fast and cuts gassing at the cathode.
  • Smooth, bright and leveled. The layer builds evenly across the current density range, so edges and recesses finish closer in appearance and need less mechanical work afterwards.
  • Continuous and single-piece work. One additive covers wire, strip and tube lines and rack or hand-dipped parts.
  • Fits an existing sulfate bath. It is not tied to one make-up recipe, so it can be dropped into a zinc sulfate and boric acid bath that is already running.
  • A wide working window. Temperature and pH can move within the published band without a reformulation, which suits shops with changing ambient conditions.
  • Part of a matched range. We supply it alongside the pretreatment, passivation and sealing chemicals a sulfate line needs, so the chemistry and the advice for the whole process of electroplating come from one supplier.
  • Built for shop-floor use. Nothing about it needs a specialist operator or new equipment; a metal plating shop already running a standard zinc sulfate bath can adopt it as it stands.

Bath Formulation & Operating Conditions

Bath typeSulfate acid zinc, based on zinc sulfate and boric acid
Zinc sulfate (ZnSO4·7H2O)300–450 g/L
Boric acid (H3BO3)20–30 g/L
SZ-30 brightener14–18 ml/L
pH3.0–4.5
Temperature10–50 °C
Cathode current efficiency>95%
Anode0# zinc ingot
Brightener formLiquid concentrate, measured by volume per litre of bath
Monitoring pointspH, temperature, brightener level and zinc content — the four readings that keep the plating process in control

Zinc Sulfate Make-Up & Solution Control

Bath make-up. Dissolve the zinc sulfate heptahydrate in warm water first and let the sediment settle before you filter or decant. Charging the brightener into a cloudy make-up locks the dirt into the bath. Add the boric acid, bring the volume up, then charge the brightener last and circulate before the first load goes in.

Hold the pH inside the band. The boric acid is there to buffer the cathode film, and pH is the first thing to check when brightness falls away. Acid additions pull it down, while it creeps up as zinc is plated out and drag-out returns rinse water to the tank. A calibrated meter and a short check at the start of each shift catch most drift before it shows on the parts, and they keep the plating process predictable from one shift to the next.

Watch the iron. Pickling carry-over, dropped parts and unbagged anodes all put iron into a sulfate bath. A little is tolerable; a lot takes the brightness out of the deposit, grays the work and clouds the solution. Keep racks dressed, bag the anodes, filter continuously, and when iron still climbs, treat the bath with a purification agent that settles iron without stripping zinc.

Filter and analyse on a routine. Continuous filtration keeps anode sludge and airborne dust out of the deposit; batch filtration is the minimum. Titrate zinc and check pH daily, and keep a simple log of brightener additions against square metres plated so the trend is visible instead of guessed at.

Dosing and consumption. Add brightener by consumption, not by the calendar. Drag-out, part geometry and rinse discipline decide how fast it leaves the tank, so there is no single figure to quote for this grade — track it over your first month and reorder against your own number. Clean final rinses and controlled drag-out do as much for consumption as any dosing rule.

Wire Diameter & Current Settings

Wire diameter (mm)Plated length (m)Running speed (m/min)Current per wire rod (A)What the band suits
φ ≤ 15–810–3020–80Fine wire, run at the highest line speed with the lowest current per rod
φ ≤ 2.510–167–20120–350Mid-size wire, carrying the longest plated length of the three bands
φ ≤ 58–125–10200–500Heavier wire, run slower with the highest current per rod

Anode & Line Hardware

  • 0# zinc ingot anode. The formulation is written around 0# zinc ingot, so anode dissolution stays clean and the sludge load stays manageable.
  • Anode bags and spacing. Bag the anodes to keep dissolution sludge out of the deposit, and re-space the bars whenever the rack layout or work size changes so current distribution follows the load.
  • Clean contacts. Corroded bus bars and hooks create hot spots that show up as uneven brightness; check them on the same routine as the bath analysis.
  • Tank and extraction. A plastic tank, or a steel tank with a PVC or polypropylene lining that stands up to acid zinc plating chemicals, together with extraction at the tank edge, keeps both the solution and the working area in good order.
  • A rectifier with low ripple. Ripple shows up as roughness and inconsistent brightness, so check the DC supply before blaming the chemistry.
  • Continuous filtration. Keeping the loop closed removes anode sludge and airborne dirt, which is what most pinholes and rough patches trace back to. Anode condition, filtration and drag-out all feed back into the process of electroplating, so review them together rather than one at a time.
  • Spares worth holding. Anode bags, filter cartridges and spare hooks are the items that stop a line when they run out; keep them on the shelf.

Ordering & Delivery

  1. Tell us the bath volume, what you plate and how the line runs — continuous wire, strip, rack or single workpieces — so we can confirm the charge and how the additive fits the rest of your metal plating process.
  2. Choose the pack that matches your consumption; packing follows the same options we run across our plating chemicals: 10 kg/box; 25 kg or 50 kg/bag; 20 kg/25 kg/30 kg/200 kg/drum; 1000 kg/IBC drum. Minimum order quantity varies by chemical and is confirmed with our sales team per order.
  3. Payment is 100% T/T in advance.
  4. Production lead time is 2 weeks.
  5. Shipping is arranged per the terms agreed in the current contract.
  6. If a sulfate bath is new to you, ask your sales contact about trial quantities before ordering full drums.

Documentation & Compliance

  • Safety data sheet: request the current SDS for the product and destination market before the first drum ships, so your EHS team can complete site clearance and operator training. Keep it with the plating chemicals store, not in an office file.
  • Batch inspection certificate: after delivery we issue an inspection certificate stating the batch number and warranty period. File it with the receiving record so a drum can be traced back to its lot.
  • Composition statement: SZ-30 is a brightener for sulfate acid zinc baths built on zinc sulfate and boric acid. The bath is not a cyanide zinc system, and the additive is not a chromate passivation product; hexavalent chromium is not part of this chemistry. Passivation is a separate step, so the chromium status of the finished coating follows the passivator you choose.
  • REACH and RoHS: we confirm the applicable declaration for the product and the market you are shipping to rather than applying one blanket statement across all electroplating chemicals. Tell your sales contact the destination country and the finish specification so the right document is prepared.
  • Storage conditions: keep containers closed and upright in a cool, dry, ventilated store, out of direct sunlight and away from acids and oxidisers. Use secondary containment for drum storage, keep labels legible, and never decant into unmarked containers.
  • Shelf life and transport: shelf life and transport classification depend on the batch and route; confirm both with your sales contact when the order is placed, and pass the transport documents to the receiving site before delivery.

Deposit Performance & Test Methods

PropertyWhat to establishHow to verify
Appearance and brightnessWhether the deposit matches the agreed colour and gloss after passivationPlate a panel at production current density and compare with a retained standard under the same lighting
Coating thicknessThe zinc weight or thickness your part needs, agreed before the trialCross-section, XRF or coulometric gauge; record the current density and line speed used
Corrosion resistanceThe salt-spray hours required by the drawing, with the passivation and sealing step namedNeutral salt spray to ASTM B117 or ISO 9227; report hours, thickness and passivation type together
Adhesion and ductilityWhether the coating survives bending, drawing or wire handling without cracking or peelingBend, draw or adhesion test on your own workpiece before a full production load
Deposit distributionWhether edges, recesses and high-current areas stay within the appearance standardPlate a shaped rack panel or a sample of the real part and inspect high- and low-current areas separately
Trial protocolWhether the additive fits the whole metal plating process, not just the plating tankRun the sample through pretreatment, plating, passivation and drying, then compare with your current finish
Lot-to-lot comparisonWhether a new drum behaves like the last oneKeep a plated coupon from each batch and compare brightness and thickness before releasing the drum to production

Technical Support & Model Matching

Choosing the right match is where most sourcing decisions stall. As a trading supplier, we keep one point of contact from first enquiry to after-sales: tell us what you are making and the conditions you work under, and we shortlist the closest matches from our supplier network, compare specifications and arrange samples before you commit to a bulk order. If something does not behave as expected, we work with the supplying partner on the cause and a practical fix, and stay with the case until it is settled. Email, WeChat or WhatsApp enquiries get a reply within 24 hours.

FAQ

Can this brightener go straight into the sulfate zinc bath we already run?

Yes. It is formulated for sulfate acid zinc baths rather than one fixed recipe, so it can be charged into an existing zinc sulfate and boric acid bath — the same approach we take across our acid zinc plating chemicals range. Check the zinc sulfate and boric acid content and bring the pH into range before the first addition, then plate a test piece before you commit a production load. If the bath has been idle or carries heavy iron, filter and treat it first.

Can one bath serve wire, strip and rack work?

Continuous galvanizing and single workpieces are both served by the same additive, which is why it suits lines that switch between coil or wire work and short rack runs. The difference sits in the settings, not the chemistry: running speed and current per wire change with diameter, and rack work moves to a lower current density with a longer dwell. Use the wire setting table for the continuous side and adjust from a test panel for rack loads. Keeping the metal plating process stable across both is mostly a matter of holding pH, temperature and brightener level constant.

How do I decide when to add more brightener?

By consumption, not by the calendar. Drag-out, part geometry and rinse discipline decide how fast the brightener leaves the tank, so log additions against square metres plated and let your own figures set the dose. Plate a test coupon before and after an addition and compare brightness side by side. Treated that way, the other plating chemicals on the line stay in balance too and the bath stops drifting between corrections.

What causes a dull or gray deposit?

Usually contamination, or a control point that has slipped. Iron and copper build up from pickling carry-over, dropped parts and unbagged anodes, and they gray the deposit and cloud the bath. Low brightener, pH outside the working band, temperature below the range and weak filtration produce similar symptoms. Work through them in that order — analyse the bath, check pH and temperature, confirm the brightener level, then look at filtration — before changing anything. Ruling contamination out first saves a lot of unnecessary additions on any metal plating line.

How should the additive be stored and handled?

Keep drums and containers closed in a cool, dry, ventilated store, away from oxidisers and out of direct sunlight, and keep the safety data sheet with the container. Treat it as an industrial chemical: gloves and eye protection when decanting, and no eating or drinking in the plating area. Ask your sales contact for the safety data sheet and the composition statement that applies in your market, since electroplating chemicals can carry different labelling requirements from country to country.

REQUEST MORE DETAILS

Please fill out the form below and click the button to request more information about
Name
Email *
Message
Verification Code *
Click to verify
Leave a message
Name
Email *
Message
Verification Code *
Click to verify