• Fengfan Industrial Grade Cyanide Free Alkaline Zinc Plating Additives Environmental Friendly ZN-100
  • Fengfan Industrial Grade Cyanide Free Alkaline Zinc Plating Additives Environmental Friendly ZN-100

Fengfan Industrial Grade Cyanide Free Alkaline Zinc Plating Additives Environmental Friendly ZN-100

Cyanide-free alkaline zinc plating additive for rack and barrel lines: bright, compact deposits, simpler wastewater, and a staged route off cyanide.
  • Fengfan Industrial Grade Cyanide Free Alkaline Zinc Plating Additives Environmental Friendly ZN-100

Description

Product Overview

ZN-100 is a composite additive for cyanide-free alkaline zinc plating that does the work of both the brightener and the additive in the same bath. Plating shops reach for it when they want a bright, well-levelled zinc deposit without a cyanide-based brightener sitting behind it.

It is dosed into a bath built on zinc oxide and sodium hydroxide and runs on rack and barrel lines alike. Fastener plants, hardware finishers and job shops in industrial metal plating use it where the finish has to look the same across a mixed workload, not only on the faces nearest the anode.

The additive belongs to Fengfan's electroplating chemicals range, alongside the acid zinc, cyanide zinc and zinc-nickel systems, so a line that already buys chemistry from us can add or change a process without opening a second supplier file.

Most of the work is fastener zinc plating: small parts with straightforward geometry that need a bright finish quickly rather than a heavy build. On that kind of part the metal plating process earns its keep by turning work around fast and keeping appearance consistent from barrel to barrel.

Key Performance Advantages

  • Wide current range — brightness holds across a broad current density window, so the deposit stays even when the plating process moves between light and heavy work instead of showing one bright band and one dull edge.
  • Bright, uniform, compact layer — the deposit is dense and even, which gives a clean appearance straight out of the tank and a surface that survives handling on its way to passivation.
  • Good adhesion and leveling — the zinc keys properly to the steel and fills light surface variation, cutting the polishing that would otherwise sit between plating and passivation.
  • Composite design — one plating chemicals item carries the brightening and the conditioning duty, so bath analysis and top-up work from a single figure instead of a multi-drum system.
  • Stable working solution — the bath holds its behaviour through long runs, which is what keeps reject rates flat on high-volume industrial electroplating lines.

Ingredients and Physical Parameters

Bath ingredientNon-cyanide bathLow-cyanide bath
Zinc oxide (g/L)9~127~12
Sodium cyanide (g/L)—1~8
Sodium hydroxide (g/L)100~130100~120
ZN-100 brightener (g/L)4~84~8
Alkaline zinc plating throwing-power agent (g/L, added or not according to the situation)43~5
Aldehyde contentNot containedNot contained
Chelating agentsNot containedNot contained

Conversion From Cyanide Baths

Most plants on an industrial electroplating line come to this additive because of a sodium cyanide bath. It was built so that a cyanide zinc bath can move to a non-cyanide alkaline bath without scrapping the tank, and so that a plant which cannot stop using cyanide in one step still has a brightener that works while it gets there.

The bath table above sets out both routes — a fully non-cyanide bath and a low-cyanide bath — which means the metal plating process can be changed across several production cycles instead of being done over a weekend.

The additive tolerates alkaline zincate chemistry and trace cyanide. That tolerance is what makes the staged route practical: cyanide carried over from the old bath does not spoil the new one, and the brightener keeps performing while the level is walked down.

On the non-cyanide route there is no free cyanide to charge, monitor or destroy, and the housekeeping on the line changes with it — the bath behaves like the rest of the alkaline cell rather than like a cyanide tank with extra rules bolted on.

Plan the changeover with us rather than around us. Local discharge limits, the rinse train downstream and the parts you run all affect how quickly the cyanide level can come down and how steady the plating process stays while it does.

Operating Window and Line Settings

SettingValue
Temperature5~40 °C
Cathode to anode ratio (SK : SA)1 : 1.5~2
Anode0# zinc ingot
Rack plating cathode current density0.5~4 A/dm²
Rack plating cathode movement8~12 times/min
Barrel plating cathode current density0.5~3 A/dm²
Barrel plating barrel rotation6~8 times/min
Brightening on light workA few minutes in the bath is enough where no heavy build is needed

Rack and Barrel Plating Practice

  • Rack loads — space parts so the solution reaches the faces that matter. The bath levels well, but a face pressed flat against a contact bar will not plate bright no matter what is in the tank.
  • Barrel loads — small fasteners tumble well. Load the barrel so parts do not shadow each other and fresh solution keeps reaching the workload, and keep contact points clean so current is not lost on the way in.
  • Fast brightening on simple geometry — where the specification does not call for a heavy deposit, straightforward parts can leave the bath after a few minutes with the brightness already there. That is where the throughput gain sits on a high-volume fastener line.
  • Throwing-power agent when the shape asks for it — the optional agent is there for loads with deep recesses or weak coverage at low current density. Add it to answer a geometry problem, not as a standing dose.
  • Clean work in, bright work out — no set of electroplating chemicals will cover an oily surface. Degreasing and descaling have to be right before the parts reach the tank, or the brightness simply will not appear.
  • Built for a changing workload — this is an additive for an industrial metal plating line that runs a mix of fasteners and small hardware through the week, not one fixed part on a permanent setting.

Ordering, Packing and Delivery

  1. Send us your bath details — whether you run with no free cyanide at all or keep a low-cyanide bath — plus the parts you put through the plating process and the tank volume. That is enough for us to confirm dosing and the minimum order quantity, which varies by chemical and is confirmed with our sales team per order.
  2. Payment is 100% T/T in advance.
  3. Lead time is 2 weeks.
  4. Packing is 10 kg/box; 25 kg or 50 kg/bag; 20 kg/25 kg/30 kg/200 kg/drum; 1000 kg/IBC drum.
  5. Shipping of the electroplating chemicals follows the terms agreed in the current contract.
  6. After delivery you receive an inspection certificate stating the batch number and warranty period.

Passivation & Sealing Compatibility

Downstream stepWhat ZN-100 providesWhat to agree with your supplier
Chromate passivationA bright, compact and uniform zinc layer suited to industrial metal plating; the conversion film forms evenly and the final colour develops in the chromate bathTarget shade plus the chromate type, concentration, pH, temperature and immersion time
Rack or barrel colour controlConsistent response across the current-density range helps the shade repeatContact marks and nesting on barrel work; rack colour-critical parts individually
Rinse disciplineA clean zinc surface going into passivationRinse stages free of alkaline drag-in, which can lift chromate pH and cause a patchy or dull film
Sealer or topcoatA dense zinc base beneath the passivated filmThat the sealer suits the chromate film and will not shift the agreed colour or soften the film
Salt-spray performanceThe passivated zinc layer carries the corrosion resultNeutral salt-spray testing on your own parts under the customer's specified conditions, not a generic hour figure
Cyanide-free changeoverA route away from free cyanide without replacing the passivation stageA trial batch first, because the cyanide-free deposit can behave differently in the chromate tank

Technical Support & Model Matching

Choosing the right match is where most sourcing decisions stall. As a trading supplier, we keep one point of contact from first enquiry to after-sales: tell us what you are making and the conditions you work under, and we shortlist the closest matches from our supplier network, compare specifications and arrange samples before you commit to a bulk order. If something does not behave as expected, we work with the supplying partner on the cause and a practical fix, and stay with the case until it is settled. Email, WeChat or WhatsApp enquiries get a reply within 24 hours.

FAQ

What purity is the additive supplied at?

99% minimum, on the additive as supplied. If you are changing over from another brightener on an industrial metal plating line, send us your current bath analysis and we will confirm the dosing for your tank.

Can we run it alongside the brightener already in the tank?

Yes. It is compatible with other brighteners and additives, so it can go into an existing alkaline bath rather than only into a freshly made-up one. Run a trial batch first and judge the appearance against your current standard — that is the quickest way to see how it behaves inside your own metal plating process.

How does it affect wastewater treatment?

The bath contains no aldehyde and no chelate. Those are the two constituents that normally make zinc rinse water stubborn to break down, so the effluent from these plating chemicals is simpler to treat than a cyanide or chelated system.

Will the plated finish take a coloured chromate passivation?

Yes. ZN-100 deposits a dense, even zinc layer that takes a chromate conversion film cleanly, and the colour develops in the passivation step rather than coming out of the plating tank. Which shade you get — clear or blue-bright, iridescent yellow, olive or black — is set by the passivation chemistry you choose and by its concentration, pH, temperature and immersion time, so agree the target shade with your chromate supplier before the job runs.

Because the deposit stays uniform across a wide current density window, colour tends to hold from part to part, which matters most on barrel work where parts nest against each other and contact marks can show. For colour-critical parts, racking them individually usually gives a cleaner, more even film than barrel plating.

Rinsing between the plating tank and the passivation tank is the most common reason a colour turns patchy: alkaline drag-in lifts the pH of the chromate bath and dulls the film. Keep the rinse stages clean and the passivation bath inside the range its own supplier specifies, and the shade will repeat.

What the passivated finish then survives depends on the zinc thickness you plate, the passivation type chosen, and how the film is dried and handled afterwards. Rather than assume a salt-spray result, run a test on your own parts under the conditions your customer actually specifies, then set the line around what that test shows.

Worth confirming as well: that the chromate you plan to use is accepted in the markets you ship to, and that any sealer or topcoat applied after passivation is compatible with the film. If you are moving across from a cyanide zinc bath, the same passivation stage carries over, so the colour you already know can be reproduced on the new deposit.

How does this compare with Fengfan's other cyanide-free alkaline products?

Fengfan supplies several cyanide-free alkaline systems, including the ZN-500 brightener. Which one fits depends on your bath make-up, the parts and whether you run with no free cyanide at all or keep a low-cyanide bath — send us the bath analysis and the part list and we will tell you which one suits.

REQUEST MORE DETAILS

Please fill out the form below and click the button to request more information about
Name
Email *
Message
Verification Code *
Click to verify
Leave a message
Name
Email *
Message
Verification Code *
Click to verify