Fengfan IZE is an imidazole–epichlorohydrin copolymer: a polymeric brightening agent rather than a simple salt, and one of the chemical intermediates that hold a cyanide-free alkaline zinc bath together. Within the additive package it is the basic brightener — the layer that decides how the zinc spreads across a part before anything else adds gloss.
That distinction shows up across the whole plating process. A top brightener changes how a deposit looks; a basic brightener changes where it goes, and the two are charged and adjusted separately. It is also why this product is normally run alongside a top brightener rather than on its own, and why the pairing you choose matters more than the number you start with.
Two kinds of buyer use the same drum. Shops running rack or barrel lines in cyanide-free alkaline zinc electroplating take it as the foundation of a package built around a top brightener. Formulators buy it as a raw component and blend it into brightener concentrates of their own — which is why the specification is written as an assay of the active copolymer rather than as a ready-to-use product.
Alkaline zinc and zinc-alloy baths are the documented field, zinc nickel plating among them, so a line moving from plain zinc into an alloy bath is not starting from scratch with this chemistry. Because the material is alkaline in reaction, it drops into those baths without pulling the pH around.
| Property | Value |
|---|---|
| Chemical name | Imidazole-epichlorohydrin copolymer |
| CAS number | 68797-57-9 |
| Molecular formula | C6H9ClN2O |
| Physical form | Yellowish to yellow viscous liquid |
| Assay | ≥46.0% |
| Density (20 °C) | 1.13–1.18 g/cm³ |
| pH (as supplied) | 9.0–10.0 |
| Function in bath | Basic brightener for cyanide-free alkaline zinc |
| Bath addition | 10–100 mg/L |
| Co-additive | Top brighteners; performs particularly well with BPC 48 |
| Pack size | 25 kg drum |
The product ships in 25 kg drums. The liquid is viscous and alkaline, so keep the drum closed between draws, store it in a cool, dry place away from direct heat and sunlight, and mark the date it entered the warehouse. A drum that has been standing for a long period should be rolled or stirred before drawing, so what comes out matches what went in.
Decant what the bath needs into a clean, labelled container for the line rather than dragging the shipping drum to the tank, and keep the batch number readable on the drum — that number is what ties the drum to its inspection certificate and to the record of what was charged, when, and with what result. An open drum left standing in a metal plating shop also picks up airborne contamination and moisture, which is the last thing an alkaline zinc bath needs.
In the chemical store, treat it as you would any alkaline liquid: bunded, ventilated, off the floor and away from acids. Flush a spill with plenty of water promptly rather than letting it dry on the floor, and dispose of empty drums through your normal chemical-waste route.
| Packing | 10 kg/box; 25 kg or 50 kg/bag; 20 kg/25 kg/30 kg/200 kg/drum; 1,000 kg/IBC drum |
| Minimum order quantity | Varies by chemical; confirmed with our sales team per order |
| Payment | 100% T/T in advance |
| Lead time | 2 weeks |
| Shipping | Per the terms agreed in the current contract |
| Documents | Inspection certificate issued after delivery stating the batch number and the warranty period |
Choosing the right match is where most sourcing decisions stall. As a trading supplier, we keep one point of contact from first enquiry to after-sales: tell us what you are making and the conditions you work under, and we shortlist the closest matches from our supplier network, compare specifications and arrange samples before you commit to a bulk order. If something does not behave as expected, we work with the supplying partner on the cause and a practical fix, and stay with the case until it is settled. Email, WeChat or WhatsApp enquiries get a reply within 24 hours.
It removes one of the common causes: a deposit that builds unevenly and traps stress as it thickens. The other causes sit outside the brightener — oil or polishing residue carried into the bath, weak pretreatment, an interrupted current, or a part geometry that traps gas. In the process of electroplating those show up in different places on a Hull cell panel, which is why we ask for the panel and the pretreatment sequence rather than guessing. Send both and we will work through the cause with you.
Alkaline zinc and zinc-alloy plating is the documented field for this product, and that includes alkaline zinc nickel plating. Alloy baths differ in metal ratio, temperature and current density, so send the bath parameters and the part geometry before charging a production tank — we would rather confirm the fit than have you find out on a customer's order.
Four things: bath volume and current density band, the top brightener already in the tank and its ratio, the drag-out on your line, and whether the part goes into a chromate afterwards. With those in hand our technical contact can say where to start and what to watch on the first panel. The plating process parameters here are standard; the bath they go into is not, which is why we check before any of our chemical intermediates goes into a live tank.
Yes. Zinc plated with the aid of this product is easy to chromate, and an even conversion coating is what keeps colour and salt-spray performance repeatable on an electroplating line. Hold the passivation stage to your usual standard and check the first production lot against it; if the colour drifts, look at the passivation bath before blaming the brightener.
It is supplied as a basic brightener rather than sold as a leveling agent. The even distribution shops notice in metal plating is a consequence of its throwing power rather than a separate leveling mechanism, which is why it belongs at the foundation of the package with top brighteners — and, where a bath needs one, a leveling agent — layered on top of it.